Joey B's Eagle Project

Hello everyone! 


I am working on my Eagle Project at Wentz Run Park, in  Blue Bell this Sunday 8 September.


My project consists of refurbishing 12 park tables at Wentz Run Park in Blue Bell, PA. We're going to be taking apart the old tables and then sanding down the metal and wood. After the wood is sanded down we will be drilling holes for the new bolts to fit through. We will also need to stain and seal the wood along with covering the freshly sanded metal frames with galvanizing paint. The following weekend will be spent reassembling all of the tables. There are 5 boards per table so that leaves 60 boards to cover. 

Wear sunscreen and bring work gloves.

Some extra equipment I could use:
  • Electric sanders
  • Paint Rollers
  • Plug-In Drill
  • Electric router with a  quarter round over bit for beveling the edges of the wood 
Location: Wentz Run Park by the bathrooms (way out back near the tennis courts)
Address: 1000 Anvil Ln, Blue Bell, PA 19422

When: 8AM-6PM


Please RSVP using THIS FORM, which tells me who is coming, what tools they can bring, and also what time they can help out. It will be very important to know all of those details. We will be working rain or shine, so please be prepared.  

Thanks!

  



Comments